Swimming Pool Heating Hire
An elevated shot clearly showing the ducting system. Supply and delivery ducting was connected to spigots installed into wooden panels fitted into windows frames
Swimming pool heating hire HVAC system to support the fixed air handling replacement programme at the Trowbridge Pool and Leisure Centre.
A long term solution for swimming pool heating hire. A really nice job this one… our client was contracted to replace the fixed air handling system at the Trowbridge Pool and Leisure Centre.
Air handling HVAC systems are critical to maintaining the correct humidity and temperature in pool areas. Problems can arise when the temperature drops and condensation forms… it starts to rain from the structure of the building.
The pool is a popular facility in the area and the council wanted to ensure that it was available to use throughout an AHU replacement programme. ACR were contacted to provide a solution to maintain operation.
We recommended an ACR 160.120 climate control AHU.
These units have on-board electric heating for safe supply of warm air to spaces. Automatic controls monitor the space temperature, staging in the heater batteries as required- perfect in this instance, for maintaining the pool’s temperature.
Totalling 120kw, heating is available in in 3x 40kw stages- the space temperature requirement was 28Degrees.
The air was supplied to the area through 500mm ducts. Air was also re-circulated back to the unit through the grey suction pipe-work that can be seen above. A separate return air louvre on the AHU inlet was used for fresh air make up at 15%. Inlet panel filters are fitted to clean the air.
The system has been in operation for 2 weeks and has successfully maintained the pools environment for continued use by the public- a very satisfying result.
The ACR 160.120 Climate Control Unit Being a very versatile and compact package, these portable HVAC units lend themselves perfectly to swimming pool heating hire.
Usefully mounted in a lifting frame the unit is very tough and easy handle. The air handlers have on-board electrical heating in 3x 40kw stages and a chilled water coil with a three port valve for cooling applications.
They feature a high volume/ pressure fans with three inlet and outlet spigots for connection of flexible ductwork. The high pressure fan allows for long ducted systems. The units are fitted with full controls for automatic temperature control of spaces- remote and supply air sensors are used. The temporary system is being supplied by a 150KVA generator with fuel management included.