Turning a Warehouse into a Temporary Coldstore

One of the larger warehouse cold storage conversions we have carried out. From the initial proposal to final commissioning and ongoing support, this project ticked all the boxes for us and a very happy client.

Temporary Cold Storage in Scotland. The Scalloway fish market in Shetland

ACR were very proud to have been chosen to carry out this strategic project for Shetland Island Council. This project was a slow burner from the-off, with multiple visits to the Island, many options were discussed until the final solution was arrived at.

Additional Cold Storage Capacity for a Major Flower Distributor

Cold storage is especially tricky to maintain in readiness for the six or seven weeks of the year when you really need it. Renting equipment when you really need it makes business sense.

Temperature Controlled Warehouse Partitioning for Banana Storage

Certainly one of the largest and most challenging temperature control projects we have ever carried out. Measuring at 288,000 sq/mt and at a height of 20 metres, this area was partitioned from the main deep chill warehouse for a 15 degree storage chamber.

Temporary Computer Suite Cooling at the Big Data Institute Oxford

To install a reliable temporary computer suite cooling system. This was a very interesting and sensitive project that required a careful approach and much planning.

Heat Pump Ventilation Hire for Ambulance Triage Centre at New Cross Hospital

To provide temporary heat pump ventilation hire to a new ambulance triage centre whilst they awaited their new AHU. The AHU would be required to maintain the internal air temperature as well as ventilate the area.

Temporary Patch Room Cooling in a Data Centre

To provide temporary patch room cooling hire for a major data centre operator. This client was experiencing problems with one of their fixed units and required a temporary system to be installed for secure operation.

Emergency Server Room Cooling For London Data Centre

To provide emergency server room cooling during un-planned repair works. Critically, the area required fast installation of a cooling system to maintain seem-less operation.

Temporary Swimming Pool Ventilation Hire at Basingstoke Aquadrome

Basingstoke Aquadrome required a ventilation system to maintain operation whilst their fixed AHU was replaced.

Temporary Hospital Ventilation Hire at the RSH in Southampton

To provide temporary hospital ventilation hire whilst a AHU replacement programme was carried out.

Left Menu Icon