Heating Hire- portable air handling units available for all space heating applications.

 

The ACS 160-120 rental air handling unit offers true flexibility and safety for all space heating requirements in one neat package.

These air handling units offer safe fume free electric heating hire that eliminates the concerns of Carbon Monoxide exposure and flammable substances handling.

The warm air produced can be either blown directly into the area or from a remote location through flexible ducting. Re-circulation and filtering of the air ensures efficient clean running when the space is at temperature.

 

High capacity space heating hire- large stocks of air handling units available for fast delivery at unbeatable rates.
High capacity space heating hire- large stocks of air handling units available for fast delivery at unbeatable rates.

 

Each AHU heating hire unit includes three stages of electric heating. Sophisticated electronic controls maintain accurate control of the space temperature with options for remote or on-board sensing.

High volume/ pressure fans get the air where you need it, giving good air movement and turn over to ensure all areas are covered.

Heating Hire Specifications – The ACS Climate Control AHU

  • Two sizes of portable air handlers are available
  • Large- 120kw heating , 17,500m3/ hr air volume
  • Small- 60kw heating, 8,000m3/hr air volume
  • Heating rated at -5Degrees db air on

 

Download our ACS-160.120 Air handling unit factsheet

Fabric Air Sock Distribution

Air-sock fabric distribution ducting supplies air more evenly over greater arrears to ensure lower noise levels and drafts- this is an excellent system for air distribution and is suited to all applications.

Our rental air-sock systems are supplied in 5mt lengths that zipp together for fast safe installation. Small holes cut into the fabric distribute the air along the complete length of the duct.

 

heating hire
ACS 160.120 installed serving the mixed use area marquee. Supply and return air was fed through fixed ducting inside the area.

 

Case Study

  • The Temporary HVAC Overlay project at the Lee Valley Olympic Basketball Courts

    ACR installs this HVAC overlay system to the Lee valley temporary basketball courts.
    Read more